

Wind
power plants
Wind
power plants
Wind
power plants
With the wind at our back
With the wind at our back
With the wind at our back
Kırklareli3 Wind
Power Plant
Kırklareli3 Wind
Power Plant
Kırklareli3 Wind
Power Plant
Tekirdağ, Hayrabolu
Tekirdağ, Hayrabolu
Tekirdağ, Hayrabolu
100 MWe
Our Kırklareli 3 Wind Power Plant (RES) Project, for which a pre-license has been obtained, is planned as a storage-integrated wind power plant (RES) under our Ecowind 3 Enerji Üretim A.Ş. subsidiary in Hayrabolu district, Tekirdağ province.
With measurement stations already installed, the project is progressing, and construction is scheduled to begin by the end of 2025.
Our Kırklareli 3 Wind Power Plant (RES) Project, for which a pre-license has been obtained, is planned as a storage-integrated wind power plant (RES) under our Ecowind 3 Enerji Üretim A.Ş. subsidiary in Hayrabolu district, Tekirdağ province.
With measurement stations already installed, the project is progressing, and construction is scheduled to begin by the end of 2025.
Our Kırklareli 3 Wind Power Plant (RES) Project, for which a pre-license has been obtained, is planned as a storage-integrated wind power plant (RES) under our Ecowind 3 Enerji Üretim A.Ş. subsidiary in Hayrabolu district, Tekirdağ province.
With measurement stations already installed, the project is progressing, and construction is scheduled to begin by the end of 2025.



Observe the wind turbines operating beneath
Observe the wind turbines operating beneath
100
MWe
100
MWe
100
MWe
PLANNED TOTAL ENERGY
PLANNED TOTAL ENERGY
PLANNED TOTAL ENERGY
2026
2026
2026
PLANNED STARTING DATE OF THE PROJECT
PLANNED STARTING DATE OF THE PROJECT
PLANNED STARTING DATE OF THE PROJECT
Additional information
Additional information
Locations
Kırklareli
The province is planned to start the project
Total capacity
100
MWe
Type
Wind
Energy Plant
Our start date for the first activity
2020
We have been active since that year.